Click for HOME
Construction Articles
All About Project33
Facts & Figures
Monthly Report
Search this Site
Helpful Tools
The P33 Toybox
Project33 Gallery
Email Project33
Click to Visit Moe!
21-May-02 Planning The Hood Openings Part 4

The marathon comes to an end



ImageSo ends the 3-day 22-hour marathon and the shop is a mess!
ImageHave you ever seen such a dirty workbench? When my work area gets this messy I feel unproductive and unorganized. I do much better work and can think better in a clean environment.
ImageThe shop received a good cleaning and the hood sides and top, along with the templates for the sides were placed back in the original box they came in. In the morning it was loaded in the Durango and dropped off at the trucking company.